Name of work:- Constructing 360 T/s under LIG at S.No. 37/1/1 Kharadi Pune. A scheme of Constructing 360 T/s under LIG at S.No. 37/1/1 Kharadi Pune. is taken in hand . The land is 8 KM. away from Pune railway Station and well approachable to Pune Nagar Road and Hadapsar Bye-pass road. 15 M wide D.P. Road is passing through the layout and the road is constructed by PMC. All amenities such as School, Hospital, Shopping etc. are available near the site.

Floor Plan:
Salient Features: 

Name of Scheme : Construction of 360 T/s LIG

Location : S.No. 37/1/1 Kharadi,Dist.Pune.

Types of Schemes : Lower Income Group

Total No.of Tenements : 360 T/s

Area Per Tenement : 26.89 Sqm.

Amenities of be provided in the Tenements.

  • Parking+Four Storied(Total five buildings).
  • R.C.C. open foundation and R.C.C. framed structure.
  • External walls: 150mm thk. Thokla bricks.
  • Internal walls: 115mm thk. H.B.B.
  • External doors: Solid core flush doors.
  • Toilet doors: P.V.C. shutter with R.C.C. door frame.
  • Windows: M.S. steel windows for room and toilet.Aluminium sliding window in passage area.
  • Flooring:
    • For Rooms:Marble Mosaic tiles with ceramic skirting.
    • For Toilet:Polished Shahabad with colored gazed tiles dado and W.C. white gazed tiled with colored gazed tiles dado.
  • External plaster: Sand faced plaster(2 coats).
  • Internal plaster: 12mm Neeru plaster.
  • Ceiling plaster: 6mm Neeru plaster.
  • External paint: Cement paint.
  • Internal paint: Powder distemper.
  • Kitchen otta: Polished kadappa top.
  • W.C. pan: Orrisa type.
  • Electrification: Casing capping with copper wiring.
Project Details: 
  • Name of Work: Constructing 360 T/s under LIG at S.No. 37/1/1 Kharadi Pune.
  • Building No C4:
    The occupancy certificate is received on 15-06-2011. The allotment is in progress.
  • Building No C3:
    The occupancy certificate is received on 30-09-2011. The allotment is in progress.
  • Building No B, C1 and C2:
    The occupancy certificate is received on 20-07-2012. The allotment is in progress.